Canon City Junior High School

This historic School built in the 1920’s is undergoing a complete retrofit of the mechanical systems.  Individual ground source heat pumps will be installed in each classroom.  The bore field has been designed for the future addition of the Cafeteria, Gymnasium and the Auditorium.  The total capacity of the project is 113 tons.