Complete renovation of the second oldest building on the University campus. Replacement of the entire steam heating system. Modernization of the steam radiators to a hot water system. Addition of a steam to hot water converter in the basement. Replacement of the plumbing systems. Addition of ventilation with two DX air handling units. Fully sprinkled building.