The pumping system for the Loveland High School pool was studied in order to determine the cause of failure for the main system pump. As a result of the study, the entire pumping and filtration piping system was redesigned and replaced.
Category: K Thru 12 Schools
http://steam-engine.com/projects/kindergarten-through-12-school-experience/
Main Building
Two story addition to this K through 12 school. New classrooms, modifications to the Band room, and major upgrades to the kitchen.
Crestview Elementary
Remodel of the entire north wing including seven classrooms, the Library, and two computer classrooms. Extensive HVAC and plumbing remodeling including the addition of air conditioning.
Heatherwood Elementary
Replacement of all of the air-handling units in the school. New DX condensing units. Upgrades to the temperature control systems. HVAC modifications to architectural changes to classrooms and Library. Enlargement of the gymnasium. ADA modifications to the restrooms.
Eisenhower Elementary
Replacement of all of the air-handling units in the school. New DX condensing units. Upgrades to the temperature control systems. HVAC modifications to architectural changes to classrooms and Library. Enlargement of the gymnasium. ADA modifications to the restrooms.
Maddox Elementary
Hay Elementary
Lowell High School annex
Cherrelyn Elementary
Bishop Elementary
Replacement of entire steam heating plants including distribution piping with hot water system. Years of neglect had resulted in the mid 1950’s steam system to deteriorate beyond repair. The entire steam plant and distribution systems for these buildings was removed and replaced with a new hydronic system including end use devices. The boiler plant was modular in nature (3-5 boilers) which allowed for redundancy, easy maintenance, and excellent energy efficiency. New controls were installed that sequenced the boiler firing to meet loads, and lead/lagged so as to even the wear on the boilers. The boiler plant was also incorporated into the domestic hot water system. New end use equipment (unit ventilators, fan coil units, etc.). Replacement of entire domestic water plumbing system. All new controls. Electrical upgrades, including new lighting design.
Clayton Elementary
Replacement of the booster heater in the kitchen from electricity to a natural gas model.
Flood Middle School
Retrofit of the domestic hot water system for the gymnasium and the kitchen. Energy conservation project.
Englewood High School
Removal and replacement of the central boilers. The boiler project was done to replace leaking boilers and also as an energy saving project.
Knapp Elementary
New classroom wing addition and remodel/retrofits to various areas in the school. Coordination and extension to the existing steam and domestic water systems.