Central Chilled Water and Boiler Plant

Design of a central plant housed in a new separate building to serve the entire campus in Fort Collins. Underground utilities were designed for the distribution to the 8 separate buildings. The new plant was designed to eliminate the use of individual rooftop units. Replacement of the rooftop equipment was part of the project. The first phase is to address 4 of the buildings with future tie-in to the remainder of the campus. Approximately 600 tons and 9,000 MBH.