University Center Chiller Replacement

Design of a new central chilled water plant (450 tons high temperature hot water) and a new condenser water storage system. Because of the “land locked” existing plant, a new building was constructed and tie-in occurred through a tunnel system. The project had a fast track design and construction schedule.