Norlin Library

Addition of an 800-ton absorption chilling central plant. Major piping throughout the facility and retrofits to 16 air handling units. DDC controls and Study of Air handling systems for retrofit. Renovation of the perimeter heating systems with addition of control valves, re-piping and DDC